What are the installation steps of articulated arm swing gate motor

 1. Preparations for the installation of articulated arm swing gate motor : First, we must check whether the gate opening and closing flexibility is very good; then we need to determine the inner ground drop corresponding to the corresponding operating range of the gate operator; we need to determine the configuration power of the door operator.

2. Determination of the installation position of this gate opener: First, we need to fix the relative installation position with the two gates closed. The corresponding inner margin of the two gate operators must be greater than 100mm, so that it will not affect the manual gate opening.

3. Adjusting the height of the fixed plate for the installation of gate opener: The installation height of the corresponding fixed plate is set to determine the position of the gate opener. There are two methods. When installing the fixed plate, we can push the gate to the lower part of the walking range, and move the corresponding fixed plate to make it reach 60-110 mm from the ground for marking. The other method is similar.

4. The wiring of the gate opener installation: this link is an important part of the gate opener installation, because all the controls are here.

5. Fixed gate opener for installation: When fixing the gate opener, we should pay attention to the connected wires. It should be noted that it must be consistent with the corresponding identification color of the wiring socket in the controller. The next step is to check, switch to manual to push the gate back and forth. At this time, keep the power on and move freely with the ups and downs of the ground.

评论

此博客中的热门博文

How do I program a new car key made by the manufacturer?

What are the main features of rolling swing gate motor?

How are automatic door open sensors installed and configured for different environments?